Port facilities for commercial vessels:

1. Container, RO-RO, and bulk materials traffic is conducted in the pier of Cos Nou.
3 docking alignments of 93, 211, and 106 m respectively, and a depth of 7 m with 3 ramps RO-RO, 3 cranes of 30 T for containers and bulk materials, unloading of cement in bulk, and water service at the pier.

2. Passenger traffic and cruise ships at the pier Comercial
Poniente (West) docking alignment of 184 m and a depth of 9 m with ramp RO-RO, marine station with portable gangway, water service, removal of solid waste.
Levante (East) docking alignment of 360 m and a depth of 9 m with ramp RO-RO, water service, removal of solid waste and waste water.

3. Fuel and oil products at the pier Cala Figuera, with 140 m of docking and unloading facilities.

4. Anchoring
Zone II to the SE of point Esperó, no limit on length and depth
Zone I to the west of the Isla del Rey, depth 9 m